Starting to dig pool |
Sprinkler system in pool |
Main hall looking south |
Preparing to pour gym floor |
Pool digging complete |
Digging whirlpool |
Pouring gym floor |
Gym floor concrete complete |
Framing walls of pool |
Plumbing for the pool |
Setting electrical switch gear for the building |
Setting HVAC unit on roof |
Setting of the HVAC units complete |
Framing walls for siding |
Whirlpool ready for concrete |
Back stairs installed |
Blowing concrete onto walls |
Pool concrete completed |
Light pole foundation ready on Second Street |
Framing ceiling in front lobby |