Setting Bar Joist for second floor roof |
Another view of roof joist |
Gray brick SW corner of Second Street |
Interior walls of main hall offices |
More overhead plumbing and ductwork |
Wall started between girl's and boy's locker rooms |
Roof decking being installed |
Curbs ready for HVAC roof units |
HVAC ductwork on second floor ready for roof top units |
Plumbing for second floor bathrooms started |
Glued-Laminated-Timber Beams for pool ceiling (over 5200 lbs each) |
Fire sprinkler system installation |
The transformation has begun |
Variable-Air-Volume Units (VAV) for zone air quality control |