Progress thru October 14, 2013

Starting to dig pool

Sprinkler system in pool

Main hall looking south

Preparing to pour gym floor

Pool digging complete


Digging whirlpool

Pouring gym floor

Gym floor concrete complete

Framing walls of pool

Plumbing for the pool

Setting electrical switch gear for the building

Setting HVAC unit on roof

Setting of the HVAC units complete

Framing walls for siding


Whirlpool ready for concrete


Back stairs installed

Blowing concrete onto walls

Pool concrete completed


Light pole foundation ready on Second Street
Framing ceiling in front lobby