Sunday, November 17, 2013

Progress thru November 15, 2013

Deck drains installed


Sidewalk started on Second Street

Second floor windows on front of YMCA

Membership sales trailer

Second floor windows - inside view looking north

 

 

Front entrance completed

 

Kalwall on east wall of gym

Second Street view

Third Street view

Awning over main entrance

Monday, October 14, 2013

Progress thru October 14, 2013

Starting to dig pool

Sprinkler system in pool

Main hall looking south

Preparing to pour gym floor

Pool digging complete


Digging whirlpool

Pouring gym floor

Gym floor concrete complete

Framing walls of pool

Plumbing for the pool

Setting electrical switch gear for the building

Setting HVAC unit on roof

Setting of the HVAC units complete

Framing walls for siding


Whirlpool ready for concrete


Back stairs installed

Blowing concrete onto walls

Pool concrete completed


Light pole foundation ready on Second Street
Framing ceiling in front lobby

Thursday, September 12, 2013

Progress thru September 12, 2013

Roof decking completed on kids' zone roof
First wood beam for pool roof


Wood beams all installed for pool roof


Roof decking completed on mechanical room and rooms behind pool area


Preparing to brick the north and east walls of gym


Wood decking started for pool roof


Wood decking complete on pool roof


Decking started on gym roof


Pool roof storm water and overflow drains installed


Beautiful brick work on Second Street



North wall of gym completed


Roof decking for gym completed


Pool roof being installed


Metal framing on second floor started


Metal framing for bathrooms on second floor


Clear finish being applied to pool ceiling

Sunday, August 18, 2013

Progress thru August 16, 2013

Setting Bar Joist for second floor roof
 
Another view of roof joist
  
Gray brick SW corner of Second Street
 
Interior walls of main hall offices
 
More overhead plumbing and ductwork
 
Wall started between girl's and boy's locker rooms
 
Roof decking being installed
 

Curbs ready for HVAC roof units

 
HVAC ductwork on second floor ready for roof top units
 
Plumbing for second floor bathrooms started
 
Glued-Laminated-Timber Beams for pool ceiling (over 5200 lbs each)
 
Fire sprinkler system installation
 
The transformation has begun
 
Variable-Air-Volume Units (VAV) for zone air quality control