Progress thru November 15, 2013

Deck drains installed

Sidewalk started on Second Street

Second floor windows on front of YMCA

Membership sales trailer

Second floor windows - inside view looking north



Front entrance completed


Kalwall on east wall of gym

Second Street view

Third Street view

Awning over main entrance

Monday, October 14, 2013

Progress thru October 14, 2013

Starting to dig pool

Sprinkler system in pool

Main hall looking south

Preparing to pour gym floor

Pool digging complete

Digging whirlpool

Pouring gym floor

Gym floor concrete complete

Framing walls of pool

Plumbing for the pool

Setting electrical switch gear for the building

Setting HVAC unit on roof

Setting of the HVAC units complete

Framing walls for siding

Whirlpool ready for concrete

Back stairs installed

Blowing concrete onto walls

Pool concrete completed

Light pole foundation ready on Second Street
Framing ceiling in front lobby

Thursday, September 12, 2013

Progress thru September 12, 2013

Roof decking completed on kids' zone roof
First wood beam for pool roof

Wood beams all installed for pool roof

Roof decking completed on mechanical room and rooms behind pool area

Preparing to brick the north and east walls of gym

Wood decking started for pool roof

Wood decking complete on pool roof

Decking started on gym roof

Pool roof storm water and overflow drains installed

Beautiful brick work on Second Street

North wall of gym completed

Roof decking for gym completed

Pool roof being installed

Metal framing on second floor started

Metal framing for bathrooms on second floor

Clear finish being applied to pool ceiling

Sunday, August 18, 2013

Progress thru August 16, 2013

Setting Bar Joist for second floor roof
Another view of roof joist
Gray brick SW corner of Second Street
Interior walls of main hall offices
More overhead plumbing and ductwork
Wall started between girl's and boy's locker rooms
Roof decking being installed

Curbs ready for HVAC roof units

HVAC ductwork on second floor ready for roof top units
Plumbing for second floor bathrooms started
Glued-Laminated-Timber Beams for pool ceiling (over 5200 lbs each)
Fire sprinkler system installation
The transformation has begun
Variable-Air-Volume Units (VAV) for zone air quality control